[!--temp.baidutongji--]
Publish: 2021-11-18 09:07:35
Views:
The people currently used in daily life are also more, Impact Mills of oat is smashed into standard size, usually smashed into micrometers, usually our equipment is available. The plurality of devices are constituted, and is usually composed of a portion of a coarse crushed, fine powder or a wind device, or the like. The main purpose is to use wind energy to be powdered, and have canceled the traditional screening at the time of use. The main application is more useful in many industries such as mining or building materials. Some industries such as metallurgical or building materials, chemicals, etc. are useful to use large crushers for work.
In the production process of crushing using Impact Mills of oat, the ultrasonic air flow generated by the device can constantly collide between the materials, and this supersonic airflow can also produce very good. A good impact, and then the material can also have a good crushing effect with the inner wall of the equipment.
ALPA Soconne Impact Mills of Oat Sharing: The company is a professional manufacturer of active biological extracts, which requires a superfine pulverizer that meets GMP requirements, and investigates a number of powder equipment manufacturers, and finally purchased. Our AlPa's Impact Mills of Oat.
Technical parameters:
finished particle size: 100 full pass
production capacity: 120kg
Installation considerations for installation
1, the classifier, fan, etc. Host equipment is initially inspected, there is no erosion in the transportation process or after long-term storage, see if there is no abnormality in the equipment and fan airways, turn the hierarchical impeller and the wind turbine spindle, and observe whether it is flexible.
2. Check the degree of fastening of the equipment pre-installed components, and must be added to the lubricating oil to be lubricated.
3, the mounting grading wheel should strictly prevent collision, classify the host, and the fan should be tested, and the level is specified by the gasket, and there is a basic requirements and the foundation fixation.
4, require the sealing pipe interface to configure the sealing gasket.
5, after the layout machine is installed, first observe the direction of grading motor.
6. When the control cabinet is installed, the corresponding relationship between the terminal sequence number and the equipment is carefully verified.
7. After the installation is completed, the first empty car is running 1-2 hours, and it is easy to securely check the accuracy and coordination of the equipment action at any time.
The company provides free experiments and testing, and provides 24-hour consultation services, welcome to use.
Previous: Turbo Mills of buckwheat bran
E-mail: marketing@alpapowder.com
Add.: No.168, Wenhua Road, Advanced Manufacturing Industrial Park, Anqiu, Weifang City, Shandong Province, China.
Copyright © 2000-2019 | Shandong Alpa Powder Technology Co., Ltd. All rights reserved | Sitemap