[!--temp.baidutongji--]
Publish: 2021-09-26 16:10:29
Views:
Many manufacturers who want to make a crushing process will choose to buy a Single Classify Wheel ClassifierNatural Flake Graphite, but not all crushers can apply production and processing, erroneous processing methods make pulverizer The wear speed is fast. The wear of the pulverizer is too fast, and the inner cavity of the pulverizer of the comparison should be used when the material hardness is too large. The equipment operates for a long time in a higher crushing pressure, which requires uniformity of cyclical replacement loss. The products after the crushing products are generally single peaks. If there is a double-peak or peak main reason, the pulverization pressure is unstable. The solution is based on the gas supply of gas source equipment to meet the amount of gas required for work, ensuring that the lowest air supply pressure of the gas is high than the working pressure. The feed speed is unstable. Solution to check if there is a blockage at the feed valve; the material is not very viscous, uniform in liquidity, and the stable control feed speed. The filter cake is formed in the pulverizer chamber. The solution is suspended, and the filter cake in the pulverizer chamber will then restore production.
Let's talk about how to use Single Classify Wheel Classifiernatural Flake Graphite. First, prepare before booting, attachment machines, pipes, and valves, whether it is intact, whether it works properly . Second, open 1. On the compressor power supply, the pressure valve and the main air valve of the dust collector, then turn on the power switch of the powder machine, and turn on the power. 2. The zero start classification wheel is gradually adjusted to the specified speed. 3. Turn on the fan, the cyclone separator discharge, dust removal, feed motor power, and then turn on the total power supply of the tube bar, set the inverter frequency, and then begins to break. 4. The granularity of the finished wheel can be adjusted by grading wheel frequencies and charging. Third, the sequence of shutdown is: inverter - feeder - Main valve - Compressor - Steady wheel motor - Cyclone discharge, dust removal switch - Fan - Total Power - Air Compressor. Fourth, repair 1. The motor should be lubricated regularly, but the grease should not be too large, the bearing temperature is too high. 2. Hierarchical impeller, spiral feeder, crushing nozzle wear should pay attention to check, belt tight and suitable. 3. After a crushing material, after a certain period of time, it is necessary to remove the inner sticky of the chalk, so as to avoid blocking, thereby affecting the crushing effect.4. After the filter bag is a period of time, it should be cleaned or replaced. 5. Precautions 1. When the discharge device is running, the unloading port cannot be extended to avoid accidents. 2. The rotational speed of the impeller must not exceed the specified requirements, otherwise the temperature is too high, the impeller and electricity will be damaged. 3. Regularly check the safety valve to ensure safety.
E-mail: marketing@alpapowder.com
Add.: No.168, Wenhua Road, Advanced Manufacturing Industrial Park, Anqiu, Weifang City, Shandong Province, China.
Copyright © 2000-2019 | Shandong Alpa Powder Technology Co., Ltd. All rights reserved | Sitemap